loader image

Frequently Asked Questions

Questions? We Have Answers.

Below you’ll find answers to the questions we hear most often from builders, architects, and homeowners. If we haven’t answered your question, contact us here. →

Company
System
Manufacturing
Shipping

Company Questions

A quick look at who we are, what we offer, and how to reach our team.

What kind of support does Super Floor USA provide throughout the construction process?
Super Floor USA offers a full-service approach, providing support from project pricing and engineering to manufacturing and on-site installation. This comprehensive support ensures the success of each project.
What is the lead time from acceptance?
It depends on the scope of the project but for a residential job under 8,000 sq ft. We can ship typically in 4-6 weeks.
Do we deal with you at the manufacturing level or do we have a regional guy per area of jobs?
We do not have a distributor that handles Idaho yet, so you would deal directly with us until then.
Where is Super Floor USA located?
The company and manufacturing is headquartered in Batavia, OH.
Do you offer any warranties for your cold-formed steel framing systems?
Check with a Super Floor USA representative for specific details regarding product warranties.
Are your framing systems compliant with building codes and regulations?
Check with a Super Floor USA representative for specific details regarding the compliance of our framing systems.

System Questions

Get clear answers about how the Super Floor system works and what makes it different.

Is this a stay-in-place form?
Yes.
How thick should the concrete be?
A minimum of three and a half inches is recommended, but four inches offers a more rigid floor.
What's the maximum span?

We can span up to 34 ft depending on the load requirements.

How does the Super Floor System contribute to faster construction timelines?
The precision manufacturing of components, such as Joists, Lockbars, and Trays, in-house allows for a seamless fit, reducing labor costs, and speeding up the construction process. Additionally, the system requires no shoring, further enhancing construction efficiency.
What types of projects is the Super Floor system best suited for?
The Super Floor system is ideal for mid-rise construction, including condominiums, apartments, hotels, and various institutional, commercial, and industrial buildings. Its versatility allows integration with different building materials.
Can you explain the integration of the Super Floor system with other building materials on construction projects?
The Super Floor system is designed to integrate seamlessly with various building materials, offering flexibility in construction. The systems include pre-punched service holes, allowing for efficient collaboration with mechanical, electrical, and plumbing components.
What are the key differences between the Super Floor system and other flooring systems?
Super Floor offers faster installation with pre-cut components and hanger brackets, reducing labor intensity compared to traditional methods like I-Joists and plywood.
Can the Super Floor system accommodate overhangs?
Yes, overhangs of up to three or four feet are feasible with conventional forming and appropriate steel support.
What materials are used in the Super Floor system?
The system uses high-tensile galvanized steel joists and trays with G110 coating for trays and G90 for joists and lock bars to prevent corrosion.
What wall systems are compatible with Super Floor?
Super Floor can be used for a variety of building types, including ICF structures, Steel frame buildings, masonry buildings, poured in-situ, and precast concrete.
What are the fire resistance properties of the Super Floor system?
The concrete topping provides excellent fire resistance compared to traditional wood flooring systems.
How does the Super Floor system integrate with ICF?
Special hanger brackets are used to bridge the foam, and the concrete floor is poured up to the outside portion of the block, ensuring continuity and structural integrity.
What are the advantages of using lightweight concrete with your Super Floor system?
Lightweight concrete is not recommended with our system as it may not fully support the pre-cambered joists.
What is the typical joist spacing for Super Floor systems?
Joist spacing varies from 1 to 5 feet, depending on load requirements and design specifications.
Can the system be used for both flat and pitched roofs?
Yes, the system is suitable for both, with specific design considerations for pitched roofs to ensure proper drainage and load support.
What safety procedures should be followed during installation?
Follow general safe work procedures, ensure correct and safe positioning of joists, use mobile scaffolding or lifts for height work, and complete a job safety analysis if site conditions differ from the standard procedure.
What are the benefits of using Super Floor in high-seismic regions?
Super Floor is designed to meet seismic requirements, providing flexibility and strength needed for earthquake-prone areas.
Can Super Floor simplify foundation design?
Yes, by reducing the need for multiple footers, Super Floor can simplify foundation design and potentially reduce construction costs.
How does the absence of shoring benefit construction projects using the Super Floor system?
The absence of shoring simplifies the construction process, saving valuable time and effort. It contributes to a cleaner construction site and reduces the amount of waste material to dispose of.
What are the methods for installing the Super Floor system, and which is the easiest?
The Super Floor system can be installed using various methods, including forklifts, material lifts, telescopic lifts (commonly known as lulls), cranes, and Bobcats. Among these, the telescopic lift (lull) is highlighted as the easiest method due to its efficiency in handling joists.

Manufacturing Questions

Learn how our system is built, the materials we use, and where it’s made.

Can you provide more details about the custom manufacturing process for Joists, Lockbars, and Trays?
Super Floor USA takes pride in manufacturing Joists, Lockbars, and Trays in-house, ensuring the highest quality and precision tailored to each job. This custom approach guarantees a perfect match for the unique needs of each project.
What makes Super Floor USA's cold-formed steel framing systems different from others in the market?
Super Floor USA’s systems stand out due to their innovative cold-formed steel framing technology, offering a higher quality building structure with greater design flexibility. The use of I-shaped components, patented connectors, and the Dovetail deck results in a simple, strong system.

Shipping Questions

How we handle lead times, freight costs, and what to expect when your order ships.

Will your quote include shipping costs?
Yes. We typically use dedicated flatbed trucks, so it is a per-mile rate.
How is the Super Floor system shipped, and how are freight costs determined?
Freight costs are determined based on the size of the project and the distance from our manufacturing facility in Batavia, Ohio, to the project site. Shipping rates typically range from $2.50 to $3.50 per mile. Our team ensures that all components, including trays, joists with hanger brackets installed, and lateral support bars are securely packaged and transported efficiently to meet your project timeline.
What are the expected lead times for Super Floor system components?
Typically, for residential projects, the lead time is 30-35 days. Lead times can vary but are generally competitive, and we make every effort to accommodate project schedules.
Resources

System Information and Resources

Load/Span Tables

Explore detailed span and load data to help you design with confidence. See how Super Floor performs across different joist sizes, spacings, and slab depths.

Downloadable Documents

Access product specs, manuals, drawings, connection details, and brochures. Everything is organized and ready to drop into your plans or share with your team.

Find Super Floor Professionals

Looking for architects, engineers, or builders who already work with Super Floor? Use our directory to find trusted professionals near you.

Installation Videos & Guides

Explore our latest YouTube videos showcasing real-world installations, expert walkthroughs, and project highlights. Watch how the Super Floor System transforms construction with ease and efficiency.

Installation Guides


Real-World Installations


Expert Walkthroughs


Project Highlights

Connection Details

From joist profiles to connection details, these PDF and DWG files give you the technical info you need to plan and build your project. They're built for engineers, architects, and contractors who want to get the details right from the start.

Download PDF Files

Download DWG Files

Download Our Brochure

Discover the benefits of the Super Floor System in our comprehensive brochure, featuring product highlights, applications, and technical insights.

Save Time. Cut Costs. Start Today.

From faster construction timelines to lower labor costs, see what Super Floor can do for your project—starting with a free estimate.

Free estimate. No obligation. No pressure.